Friday, March 20, 2009

Progress Report













How did it get to be March 20 already? The bathroom remodel started on March 4. The first two days were demolition. Then the plumber came and set the new tub and ran the necessary pipes. Then the electricity was tackled, which required our poor contractor to run from the second story to the basement and back several dozen times. Next came the insulation. Then the drywall crew. Earlier this week the woodwork and trim work was installed and today everything was primed. Here are some pictures so far: